You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
[Auto-Detected][P1] PR #589 targets master but is a 9.13.1-based legacy branch (conflicting, would downgrade trunk) #590
PR Legacy/9.13.1 #589 has base master but head branch legacy/9.13.1 is cut from the 9.13.1 tag (merge-base 7d8e83b); master is 44 commits ahead at 9.14.0-beta.6. GitHub reports mergeable: CONFLICTING / DIRTY. git diff origin/master HEAD = 441 files, +18310/−40378. The PR's own RELEASING.zh-CN.md says the merge target is legacy/9.13.1, so the base looks wrong.
Impact if forced through: master is downgraded to 9.13.2 (package.json 9.14.0-beta.6 -> 9.13.2, versions.json entries for 9.14.0-beta.x lost), 9.14 features removed, and release.yml (deleted on master in c065ed6 "remove tag-triggered Release workflow") is resurrected, re-enabling tag-triggered releases.
DevOps: CI on this PR targets master; ci.yml adds legacy/** triggers, but there is no branch protection signal preventing a PR from a stale-tag branch from targeting master. Resurrected release.yml would publish artifacts on any tag push.
Engineering: Wrong baseRefName on PR creation (fork-local PR Add authoer information #2 merged into the fork's legacy/9.13.1, then the same branch was opened upstream against master). Commit list: "fix(legacy)…" + "Merge PR Add authoer information #2…".
Architecture: A maintenance line diverged from a release tag should live on its own long-lived branch; it must not be proposed against the development trunk.
Recommended Resolution
Close or retarget PR #589 to a dedicated legacy/9.13.1 branch (maintainer-created) — do not merge into master. If any fix is wanted on trunk (settings i18n, blank-task cleanup, settings-invalidation signature), re-submit as small PRs rebased on current master, without version/manifest/release workflow/CI changes.
Activity
bitskc commentedon Nov 9, 2026
Still unresolved at PR #589 head
3781a74(9.13.10,CONFLICTING). See also #593.