Skip to content

docs(plans): record the remediation v2 close-out - #423

Merged
pacphi merged 1 commit into
mainfrom
docs/316-v2-close-out
Oct 2, 2026
Merged

pacphi merged 1 commit into
mainfrom
docs/316-v2-close-out

Conversation

@pacphi

@pacphi pacphi commented Oct 2, 2026

Copy link
Copy Markdown
Owner

Card: #316 (A61-13) on the v4.0.0 board, milestone 4.0.0-alpha.61, epic #294. It blocks #317 and #320. Source: supersession ledger exit item 7.

Summary

Remediation v2 closes with the exit release alpha.61. This records that close-out in the plans, with each statement traced to a source in the repository. Archiving the plans is #317.

  • The decision log has v2's summary entry (docs/plans/2026-09-26-issues-237-238-239-verification-and-decisions.md), the one the plan's V7 point 3 and the ledger's "Log close-out" row call for. It records what v2 delivered (V1–V7 reaching main through feat: integrate remediation v2 for human review #285 as 0511d575), where the open items went (each is a ledger exit item with a card on the board), and what the entry does not claim.
  • DoD-3 is recorded, and cites the read-back run. The entry takes the first real dispatch from M1L:51-60: scheduled watch run 36729784908, three fired records at 14:31:47Z for AQE #735, #528 and #532, the push of commit 4704a58, and the GitHub notice read back (bot author, created 14:32:50Z). It states the limits as M1L does. This establishes recorded session creation, ledger publication and notice posting, not subscriber delivery or completed routine work. No open upstream-prefixed pull request was present at that read, so the outcomes are unverified.
  • The v2 and EX Status sections are current. Both adopt the refreshes from 456ff58 exactly as written (applied with git apply, and they applied cleanly). Each also gains a 2026-10-02 close-out paragraph: v2 says it closes with alpha.61, and EX says Phase E is carried by chore: run or waive the maintainer's machine jobs #318 and chore: publish 4.0.0-alpha.61 #320, with the release checked through npx.
  • Attended time is recorded as "not instrumented." v2's Status already said so. The decision-log entry now states it formally and claims no total.
  • The global-match criterion is dropped from v2 §6 item 5, with a dated note pointing at the ledger's D-2 row. v2 §6 item 6 (DoD-3) gets a note pointing at the entry.

Things to know

Tests

  • pnpm run lint:md: 0 issues across 253 files. The first run caught a wrapped line that began with #735, which I reflowed.
  • The docs-layout and GA-surface-guard suites pass, and every relative link in the new text points at a file that exists. I couldn't run lychee locally, so the links (internal) check in CI is the real one.
  • Full pnpm test: 6,492 passed, 2 failed, 17 skipped. The two failures (process-tree, setup-memory-probe) fail identically on unmodified main in a container that runs as root, and pass in CI.

Closes #316

🤖 Generated with Claude Code

https://claude.ai/code/session_01WAbqdRJ4kk8UsjrKxYeUCd


Generated by Claude Code

Remediation v2 closes with the exit release alpha.61 (ledger exit item 7).

- The decision log gains v2's summary entry: what was delivered, where the open items went,
  attended time recorded as "not instrumented", and the dropped global-match criterion.
- DoD-3 (v2 section 6 item 6) is recorded from the read-back at M1L:51-60: scheduled watch run
  36729784908, three `fired` records, and the GitHub notice read back, with the limits stated.
- The v2 and EX Status sections adopt the refreshes from 456ff58 and gain a 2026-10-02 close-out
  paragraph. v2 section 6 item 5 drops the global-match clause.

Archiving the plans is #317.

Closes #316

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01WAbqdRJ4kk8UsjrKxYeUCd
@pacphi
pacphi merged commit d00b92f into main Oct 2, 2026
13 checks passed
@pacphi
pacphi deleted the docs/316-v2-close-out branch October 2, 2026 01:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

docs: record the remediation v2 close-out

2 participants