Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion docs/adr/0006-primary-host-and-ambidextrous-mirroring.md
Original file line number Diff line number Diff line change
Expand Up @@ -7,7 +7,7 @@
as `claude-sonnet-5`; Anthropic's first-party benchmarks show it strictly ahead on every axis
checked). `claude-sonnet-5` is retained at `tier: 'prior'` for user pins, so a pinned route now
mirrors to `gpt-5.6-sol`, not `gpt-6-sol` — the same behavior the Opus 5 → Opus 5.5 move
established. See `docs/plans/2026-09-28-sonnet-5-5-routing-refresh.md`.
established. See `docs/archive/2026-09-28-plan-sonnet-5-5-routing-refresh.md`.
- **Earlier update (2026-09-23):** Tier parity: both hosts now have a `reasoning` tier (`claude-opus-5-5` ↔
`gpt-6-astra`), so a Codex-driven seed gets reasoning-tier models and an escalation that steps up a
tier, as a Claude-driven seed does. A catalog entry may `pairs` with an extra tier.
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -17,7 +17,7 @@
**Spec:** the maintainer decisions of 2026-09-28, recorded in [§ Decisions](#decisions). There is no separate spec document.

**Status:** Implemented, 2026-09-28. Phase 1 and Phase 2 merged in PR #264 at
`main@e7cfe9ca`; Phase 3 is ready for review in PR #266.
`main@e7cfe9ca`; Phase 3 merged in PR #266 at `main@7936ca48`.

## Decisions

Expand Down
2 changes: 2 additions & 0 deletions docs/archive/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -158,6 +158,8 @@ reconfirmed by this metadata audit. The per-file inventory and limitations are r
| [2026-09-28-superpowers-plan-branch-9-follow-ups.md](2026-09-28-superpowers-plan-branch-9-follow-ups.md) | `docs/superpowers/plans/2026-09-28-branch-9-follow-ups.md` | Finished Superpowers plan | Implemented work record preserved after its implementing PR merged. |
| [2026-09-28-superpowers-plan-upstream-watch-ledger-branch.md](2026-09-28-superpowers-plan-upstream-watch-ledger-branch.md) | `docs/superpowers/plans/2026-09-28-upstream-watch-ledger-branch.md` | Finished Superpowers plan | Implemented work record preserved after its implementing PR merged. |
| [2026-09-28-superpowers-spec-upstream-watch-ledger-branch-design.md](2026-09-28-superpowers-spec-upstream-watch-ledger-branch-design.md) | `docs/superpowers/specs/2026-09-28-upstream-watch-ledger-branch-design.md` | Finished Superpowers specification | Implemented work record preserved after its implementing PR merged. |
| [2026-09-28-plan-docs-taxonomy-and-archive.md](2026-09-28-plan-docs-taxonomy-and-archive.md) | `docs/plans/2026-09-28-docs-taxonomy-and-archive.md` | Finished documentation taxonomy and archive plan | Implemented in [PR #264](https://github.com/pacphi/agentic-kit/pull/264) and [PR #266](https://github.com/pacphi/agentic-kit/pull/266). Current layout rules live in the [docs index](../README.md) and [layout guard](../../scripts/docs-layout.mjs); this plan records the build steps. |
| [2026-09-28-plan-sonnet-5-5-routing-refresh.md](2026-09-28-plan-sonnet-5-5-routing-refresh.md) | `docs/plans/2026-09-28-sonnet-5-5-routing-refresh.md` | Routing and pricing research with the implemented model-catalog decision | Implemented in [PR #268](https://github.com/pacphi/agentic-kit/pull/268). The operative tier decision is in [ADR-0006](../adr/0006-primary-host-and-ambidextrous-mirroring.md); prices and benchmarks here are dated evidence. |

## Naming convention

Expand Down
4 changes: 2 additions & 2 deletions docs/plans/2026-09-28-remediation-program-v2.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@

**Written against:** `main@e957737b`. v1 status: #258, #259, #260, #261 and #263 merged on 2026-09-28. npm still ships `4.0.0-alpha.59`, so #259–#263 are unreleased, and #263 changes the CLI in breaking ways. The only worktrees are the main checkout and this one, and no stash exists.

**Sources:** the scope reconciliation, keyed by its row ids in [Appendix A](#appendix-a-the-reconciliations-189-rows); the SDD ledger, cited as `L:NNN`; [the 6b plan](../archive/2026-09-28-superpowers-plan-branch-6b-one-refresh-flag.md), whose section "Deferred to Branch 6c" holds the dashboard task text; [the Branch 9 plan](../archive/2026-09-28-superpowers-plan-branch-9-follow-ups.md), which holds Tasks 5–14, the deferred items and N-1 to N-5; the N-5 list; the final reviews of 6b and Branch 9; and [the docs taxonomy plan](2026-09-28-docs-taxonomy-and-archive.md). The reconciliation, the ledger, the N-5 list and the reviews are git-ignored files in the main checkout under `.superpowers/sdd/2026-09-26-remediation-program/` (`reports/program-scope-reconciliation.md`, `progress.md`, `reports/n5-253-deferred-minors.md`, `reports/b6b-final-review.md`, `reports/b6b-final-rereview.md`, `reports/b9-final-review.md`).
**Sources:** the scope reconciliation, keyed by its row ids in [Appendix A](#appendix-a-the-reconciliations-189-rows); the SDD ledger, cited as `L:NNN`; [the 6b plan](../archive/2026-09-28-superpowers-plan-branch-6b-one-refresh-flag.md), whose section "Deferred to Branch 6c" holds the dashboard task text; [the Branch 9 plan](../archive/2026-09-28-superpowers-plan-branch-9-follow-ups.md), which holds Tasks 5–14, the deferred items and N-1 to N-5; the N-5 list; the final reviews of 6b and Branch 9; and [the docs taxonomy plan](../archive/2026-09-28-plan-docs-taxonomy-and-archive.md). The reconciliation, the ledger, the N-5 list and the reviews are git-ignored files in the main checkout under `.superpowers/sdd/2026-09-26-remediation-program/` (`reports/program-scope-reconciliation.md`, `progress.md`, `reports/n5-253-deferred-minors.md`, `reports/b6b-final-review.md`, `reports/b6b-final-rereview.md`, `reports/b9-final-review.md`).

**How v2 saves attended time:**

Expand Down Expand Up @@ -217,7 +217,7 @@ Seven branches. V2 has two PRs, so there are eight PRs in total. Effort is given

### V2 `docs/taxonomy-reorg` and `docs/archive-link-repair`: the docs taxonomy

**Scope:** [the taxonomy plan](2026-09-28-docs-taxonomy-and-archive.md) as written, with its Proposed status lifted by D-3.
**Scope:** [the taxonomy plan](../archive/2026-09-28-plan-docs-taxonomy-and-archive.md) as written, with its Proposed status lifted by D-3.

- PR A covers Tasks 1–9. Tasks 1–2 are tools only, so they can overlap V1. Task 3 regenerates the move map, and it starts only after the plan's "When to run" check prints nothing.
- PR B covers Tasks 10–12, cut from `main` after PR A merges and run alongside Wave 2.
Expand Down
Loading