-
Notifications
You must be signed in to change notification settings - Fork 7
feat: Footprint proof card #376
Copy link
Copy link
Open
Labels
size:MA few modules; one to three daysA few modules; one to three daysv4.0.0Routing: v4.0.0 boardRouting: v4.0.0 boardws:project-scopeThe project-scoped management redesignThe project-scoped management redesign
Milestone
Description
Activity
Metadata
Metadata
Assignees
Labels
size:MA few modules; one to three daysA few modules; one to three daysv4.0.0Routing: v4.0.0 boardRouting: v4.0.0 boardws:project-scopeThe project-scoped management redesignThe project-scoped management redesign
Why
Show that ak stays out of projects that have not opted in (design: Proof that ak stays out of other projects).
In scope
Per-session akFootprint field; parse attachment and system records for hooks; compare opted-in and not, before and after.
Out of scope
Changing other projects.
Acceptance criteria
Dependencies
Blocked by: #366
Blocks: #388
Plan
4.0.0-beta.4size:M· Workstream:ws:project-scopeP6-14in the card inventoryVerification
node scripts/run-tests.mjs focus (new footprint tests)