Why
The command surface comes down to four verbs (design Decision 8).
In scope
setup→init; host pick, off and reset-routes→init; check-connection→status --refresh=live; remove host align and the ak x dashboard and admin aliases; heal hooks→maintain and advice; x mcp, statusline, codex-context and aqe-embedding→init; x reference→sync; x ruflo-mcp→launcher; x daemon-gc→sync; remove x harvest and its live check (G6).
Out of scope
aqe-store and skills (#361).
Acceptance criteria
Dependencies
Blocked by: #357
Blocks: #361, #362, #363, #382, #387
Plan
Verification
Why
The command surface comes down to four verbs (design Decision 8).
In scope
setup→init; host pick, off and reset-routes→init; check-connection→status --refresh=live; remove host align and the ak x dashboard and admin aliases; heal hooks→maintain and advice; x mcp, statusline, codex-context and aqe-embedding→init; x reference→sync; x ruflo-mcp→launcher; x daemon-gc→sync; remove x harvest and its live check (G6).
Out of scope
aqe-store and skills (#361).
Acceptance criteria
Dependencies
Blocked by: #357
Blocks: #361, #362, #363, #382, #387
Plan
4.0.0-beta.3size:M· Workstream:ws:project-scopeP5-06in the card inventoryVerification
pnpm test