Skip to content

chore: upstream integration for 4.1 (epic) #305

Description

@pacphi

Why

Upstream fixes released after GA are adopted in 4.1 (master plan Decision 3a).

In scope

The child cards.

Out of scope

Upstream work that qualifies before rc.1.

Acceptance criteria

  • Every child card is closed or moved

Dependencies

Blocked by: None

Blocks: None

Plan

Verification

Every child card is closed.

Metadata

Metadata

Assignees

No one assigned

    Labels

    v4.1.0Routing: v4.1.0 boardws:upstreamUpstream integration and tracking

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions