Repository navigation
docs(changelog): v1.0.0 heading — merge date - #76
Merged
Merged
Conversation
The heading carried the date the branch was planned on. CLAUDE.md dates a release by its merge in UTC: PR #75 merged at 2026-10-02T03:24:51Z (gh pr view 75, mergedAt), so the heading reads 2026-10-02. The PR number it predicted, #75, was right. The five back-dated headings already match their merges' UTC dates. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
operator-directed maintenance; no cascade issue
Re-dates the
[1.0.0]heading inCHANGELOG.mdto its merge's UTC date. PR #75 merged at 2026-10-02T03:24:51Z, and the heading read 2026-09-30, the day the branch was planned.CLAUDE.mddates a release by its merge in UTC (§ Working in this repo, releases), and the harvest-5 plan's F4 Step 4 schedules this fix after the merge. The PR number the heading predicted, #75, was right. The five back-dated headings already match their merges' UTC dates.The
v1.0.0tag goes on #75's merge commit7dbd6b2, asCLAUDE.mdsays, and the GitHub Release notes are taken from this corrected heading.Review gate
/simplify— not run — a one-line date fix inCHANGELOG.md, no code changedpr-review-toolkit:review-pr— not run — the same: an issue-less docs fix (cbk-conventions.md§ Branch naming)review-sweep— skipped — docs-only diffThe verification block is green on this branch (
verification: done).🤖 Generated with Claude Code