@Nasf-Fan Nasf-Fan commented Oct 11, 2026 •

Copy link
Copy Markdown
Contributor
  1. In theory, it is possible that when exclude some engine, related ULT maybe trying to abort a DTX because of some failure happened during local modification (but related modification has succeeded on remote targets). Related DTX_ABORT RPC has been sent out but not been received or processed by related remote targets. Under such case, the DTX leader is switched because of related engine is excluded. And then DTX resync is triggered by new DTX leader who may regard such DTX as committable since all alive targets claim 'PREPARED'. Then the new DTX leader will make different decision that conflict with old DTX leader did. That may cause related DTX to be aborted on some targets but committed on the others, as to data inconsistency among related redundancy group. The new logic forbids to abort DTX from old DTX leader to avoid such inconsistency.

  2. During DTX resync, the DTX CHECK RPC should not be sent to the target which UP status and co_in_ver is newer than related DTX version. Because related DTX is either non-exist or removed on the target being reintegrated.

  3. Convert dtx_leader_begin() returned failure -DER_TX_RESTART as -DER_INPROGRESS to help client to properly handle related RPC.

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

@github-actions

Copy link
Copy Markdown

Ticket title is 'FIO crc mismatch detected on 4x node IB config while running HSN cable pulls test'
Status is 'Awaiting backport'
Job should run at elevated priority (1)
https://daosio.atlassian.net/browse/DAOS-19616

@github-actions github-actions Bot added the priority Ticket has high priority (automatically managed) label Oct 11, 2026
@daosbuild3

Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Large MD on SSD completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-19237/1/execution/node/1630/log

@Nasf-Fan
Nasf-Fan force-pushed the Nasf-Fan/DAOS-19616_2_b28 branch from ff59bcf to 458d283 Compare October 11, 2026 14:31
@Nasf-Fan
Nasf-Fan marked this pull request as ready for review October 12, 2026 05:25
@Nasf-Fan
Nasf-Fan requested review from a team as code owners October 12, 2026 05:25
@Nasf-Fan
Nasf-Fan force-pushed the Nasf-Fan/DAOS-19616_2_b28 branch 2 times, most recently from 79a0e02 to 6041ab2 Compare October 17, 2026 09:44
1. In theory, it is possible that when exclude some engine, related
   ULT maybe trying to abort a DTX because of some failure happened
   during local modification (but related modification has succeeded
   on remote targets). Related DTX_ABORT RPC has been sent out but
   not been received or processed by related remote targets. Under
   such case, the DTX leader is switched because of related engine
   is exlcuded. And then DTX resync is triggered by new DTX leader
   who may regard such DTX as committable since all alive targets
   claim 'PREPARED'. Then the new DTX leader will make different
   decision that conflict with old DTX leader did. That may cause
   related DTX to be aborted on some targets but committed on the
   others, as to data inconsistency among related redundancy group.
   The new logic forbids to abort DTX from old DTX leader to avoid
   such inconsistency.

2. During DTX resync, the DTX CHECK RPC should not be sent to the
   target which UP status and co_in_ver is newer than related DTX
   version. Because related DTX is either non-exist or removed on
   the target being reintegrated.

3. Convert dtx_leader_begin() returned failure -DER_TX_RESTART as
   -DER_INPROGRESS to help client to properly handle related RPC.

Signed-off-by: Fan Yong <fan.yong@hpe.com>
@Nasf-Fan
Nasf-Fan force-pushed the Nasf-Fan/DAOS-19616_2_b28 branch from 6041ab2 to 6a20db1 Compare October 17, 2026 11:19

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

priority Ticket has high priority (automatically managed)

Development

Successfully merging this pull request may close these issues.

2 participants