Plan integration follow-on: the low-energy day is a ladder — a step-up offered after a completed floor task, never led with #31
Description
Origin
Three owner verdicts on rubric row 3b (docs/architecture/plan-integration/receipts/now-rubric-2026-09-16.md, interactive walkthrough 2026-09-20) recorded the same finding beside a yes; the receipt names them one 0.5.x theme:
- (b) — familiar recall leads, the sit-with sits beneath it: "once I had done this, if it went well I would like the option to then take on more but not lead with the larger task."
- (c) — on the shipped screen (due recall first, micro teach-back beneath): "With an energy score of 3/10, the initial task should be light to give confidence and hopefully by doing so energy, if the task is successful then offer the user the learning task which has a higher energy score."
- (d) — the generic starter is the no-plan floor: "if this went well, a successful task often increases confidence and energy so give the user the opportunity to work on the live struggle." — recorded as the top rung: after a completed floor task, re-offer the deferred repair itself as the step-up, an option the learner takes while the win is fresh, never restored as the default.
- Also recorded: the capability numbers are subjective (3/10 vs 4/10) and the demand thresholds coarse by construction, so the ladder carries more weight than the threshold; and the owner reads a teach-back as higher demand than a plain recall although both are
lowin the demand classes — the ordering already agrees, the classes govern deferral not order.
What exists today (from the code on feat/energy-demand-body-double a4503a48 — verified, not recited)
- The engine is a snapshot:
build_now_plan(energy=…)ranks once for the energy it is given.cli/_now.pyprints that snapshot. The Today card (web/static/js/components/today-panel.js) fetches/api/nowonce, ininit(), with no energy, and no handler re-requests it after an action —startAction,pickUpParked,dismissParkednever re-plan. - The floor tasks emit no outcome the engine can read: the starter's only door is
studyloop progress "one tiny recall loop" -t <topic> -c learning; a due recall's door is the same kind of progress write; the body double's door opens a session. Nothing says "went well". - What the step-up would re-offer is already computed and carried:
energy_deferred(milestones),energy_deferred_repairs(repairs, withenergy_demandandrequired_capability), the body-double proposal, and — for alearningrow that is also due — the micro teach-back as the alternate beneath the recall (rubric 3b (c) as shipped).
What to build
- An outcome signal from the floor task. After the primary's evidence command / Today action completes, one deterministic signal: the recorded progress row (it exists) plus a re-ask of energy ("that went — how is your energy now?", 1–10), stored with the session. No inference of "went well" from the model; the learner says so, once, in one number.
- A re-plan keyed on it.
build_now_planruns again with the new energy and the completed action excluded; the Today card and the CLI (studyloop now --after <action>or the session's wind-down) show the next rung, not a fresh snapshot that repeats the same floor. - The rungs, lowest first, each already a candidate the engine knows: the familiar due recall → the sit-with (body double) → the micro teach-back on the recovered concept → one tiny concrete move on the deferred material (sibling issue) → the deferred repair itself, offered as an option with its demand stated, never as the default, and only after a completed rung.
- Never lead with the larger task. The first primary of a low-energy day is unchanged by this issue (rubric 3b (a)–(e) yes); the ladder only ever adds a next offer after a completed one.
Constraints: deterministic (a stored energy number, a completed action, the existing deferred lists); rubric-testable (a D-16 row plants row 3's world, completes the floor task, re-asks energy 5/10 and expects the deferred repair offered as an option beneath the plan's next milestone; at 3/10 again, expects the next-cheapest rung and no repair); still a proposal (no status change, nothing auto-started); the no-plan golden byte-identical for a first call with no completed action.
Out of scope
- Changing the first primary of a low-energy day, or restoring the repair as a default at any energy below its demand.
- Inferring the outcome from transcript content or a model judgement.
- Deriving the "tiny concrete move" itself — sibling issue.
Acceptance criteria
- RED tests: a completed floor task plus a re-asked energy yields a re-plan whose primary is the next rung; the deferred repair appears as an option only when the re-asked energy meets its
required_capability, and never as the primary while another rung exists; a first call with no completed action is byte-identical to today. - Today card re-plans after an action and asks the one energy question; CLI has an equivalent.
- Rubric rows added and scored by the owner (D-16).
- Docs:
docs/study-plans.md"Plan-aware now",docs/web-ui-guide.md,docs/cli-reference.md(now).
Definition of Done
- Full unit suite green;
just lint;just typecheck; golden byte-identical. - Council review of the RED and the arbitration before merge (one commit per accepted finding).
- Spec delta (
openspec/specs/active-learning-decisions) and design updated in the same change.
_Milestone renamed 0.6.0 → 0.5.x on 2026-09-21 (owner rule): follow-on work ships as 0.5.N patch releases until every issue outstanding at v0.5.0 is resolved. Where the linked receipt says "0.6.0", read "the follow-on milestone"._
Activity
docs(rubric-3b): the two 0.6.0 findings are issues #30 (concrete firs…
NetDevAutomate commentedon Sep 23, 2026
Moved to milestone 0.6.0 on 2026-09-23 as part of defining the initial MVP.
The owner defined the MVP as the release that closes 0.5.x, and its blocker as the learning-tier feed (the mentor never writes what a session produced: zero writer calls in 143,973 historical messages). Asked which failure would embarrass him more in a stranger's hands for two weeks — a lesson not read aloud, or a mentor session whose teach-back never reached tomorrow's recommendation — he chose the latter.
This issue is a real build with its definition of done intact; it is the first work of the next line, not dropped. Nothing in its body changes.